Well Pad

Supervision of works and installations at the well pad, with an approximate area of 110,532 m². The project included the oversight of the installation of all key elements: wellheads, crude oil tanks, electric generators for uninterrupted power supply, surveillance and monitoring systems, as well as trunk pipelines for oil movement. Additionally, fire protection measures and the overall site safety were supervised.

Bankers Petroleum Albania Ltd

Fier, Albania

Close-up view of a wellhead gearbox
General view of the pad with wellheads, tanks, and electric generators
View of a section of the pad with tanks, wellheads, and electric generators